The Gunnebo SpeedStile FL installation manual provides a step-by-step guide for installing the gate, control unit, and other components. Here's an overview of the process:

All wiring must be performed by a certified electrician in compliance with local electrical codes. Main Power Connection Ensure the main breaker is switched off and locked out.

Connect the "Dry Contact" (normally open) relay outputs from your access control reader to the and "Direction B Open" terminals.

Feed the AC mains cable through the designated internal chassis cable management clip. gunnebo speedstile fl installation manual

[ MASTER CABINET ] [ SLAVE CABINET ] +------------------------------+ +------------------------------+ | [Main Power Input] | | | | 230V AC / 115V AC | | | | | | | | [Logic Controller] | | | | | | | | [Sync Port]------------------|------------|-[Sync Port] | | | Sync Cable | | | [Fire Alarm Terminal] | | [Motor Drive Connection] | | (Normally Closed - NC) | | | +------------------------------+ +------------------------------+ Mains Power Connection

Once mechanical installation is complete, the unit must be calibrated.

To ensure structural integrity and smooth operation, the installation site must meet these specific physical requirements: The Gunnebo SpeedStile FL installation manual provides a

Minimum C20/25 grade solid concrete is required. Depth: A minimum slab depth of

Cable conduits must run at least 140mm below the finished floor and rise at least 50mm from the foundation level. 2. Electrical Requirements

The SpeedStile FL is shipped in heavy-duty wooden crates. Handle components with extreme care to prevent scratching the stainless steel chassis or shattering the tempered glass panels. Standard Shipment Contents Connect the "Dry Contact" (normally open) relay outputs

If you need help with a specific part of the setup, let me know:

The Gunnebo SpeedStile FL is more than a turnstile; it’s a choreography of engineering and human motion where precision, safety, and aesthetics meet. This deep text explores the SpeedStile FL from the vantage of installation: the preparatory thinking, mechanical choreography, electrical and access-control integration, commissioning, and the subtle ways a well-installed SpeedStile shapes the flow and feel of an entry experience.

Before delivery, the installation site must meet specific structural standards to ensure the stability of the speed gate cabinets. Floor Levelness : The finished floor must be flat and level to within plus or minus over the entire footprint area. Concrete Strength : The base should be concrete with a minimum resistance of Minimum Foundation Dimensions : Recommended at 2000mm x 500mm x 150mm deep (or as specified for cabinet length). Bolting Depth : Anchors require a minimum bolting depth of www.gunneboentrance.ru 2. Conduit & Cabling Preparation

Route the factory-supplied synchronization cable through the under-floor conduit from the Master cabinet to the Slave cabinet.