When accessing the DSR 2017-18, users should look for:

In the Maharashtra state budget presented on March 18, 2017, Finance Minister Sudhir Mungantiwar announced a in the PWD’s budget. Against ₹4,357 crore allocated in the previous fiscal year (2016-17), the budget for 2017-18 was set at ₹7,000 crore —an increase of over 60%.

Before a tender was floated, government engineers used the DSR to prepare for the proposed work. Each work item was assigned a DSR item code, and the quantity of each item was multiplied by the DSR rate to arrive at the total estimated cost.

The preparation of the DSR 2017-18 involved a rigorous process of rate analysis. The PWD did not arbitrarily assign rates; rather, they were derived through a calculated methodology involving: pwd dsr 2017-18 maharashtra

The of Maharashtra releases a District Schedule of Rates (DSR) annually, which serves as the foundational pricing guide for all government-funded civil and electrical engineering projects in the state.

The Public Works Department (PWD) of the Government of Maharashtra publishes a District Schedule of Rates (DSR)—also referred to as the State Schedule of Rates (SSR) or Common Schedule of Rates (CSR)—on an annual basis.

: Higher premiums were applied within Municipal Corporations and Municipal Council jurisdictions to counter steep local logistical operations. When accessing the DSR 2017-18, users should look

: Cement was pegged at ₹4,200 per metric tonne, while the strong TMT-FE-500 steel bars were set at ₹33,425 per metric tonne. The Location Multipliers

It accounts for differences in costs between rural areas and major municipal corporations/councils.

: The estimated per-day wage for Maharashtra in 2018 was approximately ₹203 , up from previous cycles. 5. Implementation Notes Each work item was assigned a DSR item

The DSR 2017-18 included extensive coverage of road construction items, including:

“Providing and laying in situ cement concrete M-10 (1:3:6) of Trap/Granite/Quartzite/Gneiss metal for foundation and bedding, including necessary compacting and curing, etc., complete as directed by the Engineer-in-Charge.”

for works executed in municipal corporations, Mumbai proper, notified tribal regions, and heavy mining areas. Material Baselines:

Contractors relied on the DSR 2017-18 to:

The DSR includes a dedicated section for the basic costs of raw materials (cement, steel, sand, brick) at that time, which are used to calculate the overall item rates. 3. Important Notes on 2017-18 Rates (GST & Area Factor)